Bulk earthworks, roads and subdivisions, with the materials and the trucks to match
More than 25 years of civil work across the Mid West, from the first cut to the last load, by the one contractor.

Lenane Holdings has been building roads, subdivisions and industrial sites in the Mid West for more than 25 years: bulk earthworks, site preparation for car parks, laydown areas, industrial developments and transport yards, and the drainage that goes with them.
A civil job can be taken from beginning to end because the pieces are already in the yard: the fleet, the operators, the tippers and road trains, and sand and gravel out of our own pits. Fewer subcontractors, fewer hand-offs, and the programme stays in one set of hands.
What a civil job covers
Bulk earthworks
Clearing, topsoil stripping, cut to fill, embankments and pads to level and spec.
Road construction
Formation, drainage, gravel pavement and final trim for rural roads, access roads and internal roads.
Subdivisions
Rural and rural-residential lots: lot earthworks, subdivisional roads, drainage and crossovers.
Site preparation
Car parks, laydown areas, industrial lots and transport yards, ready for the slab or the seal.
Drainage
Open drains, culverts, sumps and scour protection in gravel rock and limestone spalls.
Materials and cartage
Fill sand, MRD spec gravel and limestone from our own pits, delivered by our own trucks.

Roads, pits and plant for the councils
Lenane Holdings hires plant to the City of Greater Geraldton on a running basis and does road materials and repair work for the Shire of Chapman Valley, both recorded in the councils' own published payment lists. The company has been on the district's emergency earthmoving contractor list since at least 2022.
Civil projects on the record
Gravel screening at Wicka pit and crossing stabilisation
Screening gravel for the Shire at its Wicka pit and stabilising both ends of a road crossing, with plant mobilised for repairs the following week.

Pad preparation near Dongara
Bulk earthworks and stockpile management to prepare a pad on sand country south of Geraldton, with an articulated dump truck, a wheel loader and a grader on site.
Moreton Bay Estate, Dongara
Rural subdivision works at Moreton Bay Estate on the Brand Highway at Dongara.
Rural subdivisions, Horwood Road and David Road
Rural subdivision works on Horwood Road and David Road on the edge of Geraldton.
RCR Water manned plant, Broome Street
Site works for the RCR Water manned plant on Broome Street, Geraldton.
Flood damage reinstatement program, Chapman Valley
Reinstatement of flood-damaged roads and drainage across the Chapman Valley under a flood damage program.
Linfox road train assembly area
Construction of a road train assembly area for Linfox, one of the civil jobs Lenane list on their record.
Have a scope to price?
Drawings, quantities and a date. We will come back with a programme, the plant and a price.