Civil works for onshore oil and gas, from the first access road to rehabilitation
More than 20 years in the Perth Basin, extended into the Carnarvon and Canning basins with our own remote camp and facilities.

Lenane Holdings is the civil contractor the onshore oil and gas companies of the Perth Basin have used for more than 20 years: access roads, line clearing, rig sites and lease pads, pipelines and the earthworks for production facilities, then the haulage, drainage, fencing and rehabilitation that follow.
The work is priced and run as a whole, from the exploration phase through production to rehabilitation, so the client deals with one contractor and one crew. Being fully self-sufficient with our own remote camp and facilities means that crew can be put a long way from town and kept there.
What we build on a lease
Access roads
Built and maintained for rigs, service vehicles and road trains, in whatever the ground is.
Line clearing
Seismic and pipeline lines cleared to the width and the conditions of the permit.
Rig sites and lease pads
Pads, sumps, lined ponds, bunds and hardstand for drilling and workovers.
Pipelines
Trenching, padding, backfill and access for gathering and export lines.
Production facilities
Bulk earthworks, pads and drainage for plant, tanks and compressor sites.
Haulage
Materials, water and plant moved by our own transport division.
Drainage and fencing
Cut-off drains, culverts and stock fencing around the lease.
Rehabilitation
Sumps closed, pads pulled apart, topsoil respread and the site returned to the landholder.
Companies we have worked for in the basins
- Mitsui
- Strike Energy
- Beach Energy
- MRL / ERL
- Triangle Energy
- APA Group
Named in Lenane's 2024 company profile.
Every Lenane operator holds the qualifications for the plant they run, with OHS and environmental awareness training on top. Operations run under the company's HSE policy inside an Integrated Management System certified to ISO 45001 and ISO 9001, and the environmental side is managed the same way: permits, disturbance limits, weed hygiene and rehabilitation planned before the first blade goes in.
A lined pad going in, 2022


Planning a well, a line or a facility?
Send the site, the scope and the window. We will come back with plant, crew, camp and a price.