Pad preparation near Dongara
Bulk earthworks and stockpile management to prepare a pad on sand country south of Geraldton, with an articulated dump truck, a wheel loader and a grader on site.

A pad prepared on sand country down Dongara way in August 2024. The photo is Lenane's own: a Cat articulated dump truck, a wheel loader and a motor grader working the stockpiles, with cropping paddocks on every side.
On site
- Articulated dump truck for bulk haul
- Wheel loader on the stockpiles
- Motor grader for the finished surface
Source: Lenane Holdings, Facebook, 15 August 2024 ("Pad Preparation", "Down dongara way")
Related projects
Moreton Bay Estate, Dongara
Rural subdivision works at Moreton Bay Estate on the Brand Highway at Dongara.
Rural subdivisions, Horwood Road and David Road
Rural subdivision works on Horwood Road and David Road on the edge of Geraldton.
RCR Water manned plant, Broome Street
Site works for the RCR Water manned plant on Broome Street, Geraldton.
Have something similar to price?
Send the scope and the site. We will come back with plant, a programme and a price.